| SERIAL NO. |
TENDER NUMER |
TENDER DATE |
SHORT NOTICE INVITING BIDS |
CORRIGENDUM |
DETAILED BID DOCUMENTS |
| 19/2010 |
No: NEEPCO/ED/QP/C&P/Insurance Policy/HQ/389/ 2009-10/2568-85 |
09/03/2010 |
Limited tender for Insurance policy of Head Quarter Complex, Brook Land Compound, Lower New Colony, Shillong |
|
|
| 18/2010 |
NIT
No: NEEPCO/ED/QP/C&P/Insurance Policy/KHEP stage-I/388/2009-10/2548-65 |
09/03/2010 |
Limited tender for Insurance policy of Assets of Kopili including 1 st Stage Extension Umrangso, North Cachar Hills , Assam |
|
|
| 17/2010 |
LNIT-DHEP/2010/01 |
01/03/2010 |
Design, engineering, manufacture,
testing, supply, transportation, erection and commissioning of Epoxy Resin cast Dry Type Transformer required at Doyang PS of Doyang H.E. Plant.
Download Drawing |
|
|
| 16/2010 |
NIB No. 48 |
24/02/2010 |
TRANSFORMERS and SWITCHYARD for PARE Hydro Electric project |
|
Download |
| 15/2010 |
NIT No. 01/SRMC-II/AGTP/2010 |
25/02/2010 |
Water Proofing Treatment to roof etc. of 17 nos. “A” type
buildings (Double Storied) in the Colony Complex of
AGTP, NEEPCO, Ramchandranagar, Tripura(W). |
Corrigendum |
|
| 14/2010 |
NIT No. 19 |
22/02/2010 |
Disposal of Mechanical Spares from Ranganadi Hydro Electric Power Project, Arunachal Pradesh |
|
|
| 13/2010 |
NIQ No.AGTP/SRMC-I/03/2010 |
20/02/2010 |
Supply of following G.I. pipes to AGTP, NEEPCO, Ramchandranagar, Tripura(W) |
Time Extension |
|
| 12/2010 |
NIT No- 18 / SRMC-I/AGTP/2010 |
19/02/2010 |
Water proofing treatment of roof, Treatment of expansion/ Contraction joints and Sealing joints of various metallic outlets on the roof of power house building at AGTP,NEEPCO, Ramchandranagar, Agartala, Tripura (West). |
|
|
| 11/2010 |
NIT No- 16 / SRMC-I/AGTP/2010
|
16/02/2010 |
Construction of 2(two) nos. of R.C.C. Yatri (Passenger) shed at Banikya Chowmuhani . |
|
|
| 10/2010 |
NIT No- 1 / DGM(C) /TGBPP/2010 |
08/02/2010 |
Construction of Executive Hostel at TGBPP NEEPCO, Manarchak, Sonamura, Tripura ( West). |
Time Extension |
|
| 9/2010 |
NEEPCO/ES/R/42/2009 -10/03 |
01/02/2010 |
Construction of 4 (four) storied RCC building near security barrack at NEEPCO office complex,Shillong. |
Corrigendum |
|
| 8/2010 |
AGBP/SFC/2009-10/06 |
03/02/2010 |
Supply and delivery of illumination material |
|
|
| 7/2010 |
NEEPCO/ED/QP/C&P/Insurance Policy/AGBPP/386/ 2009-2010/ 2287-88 |
27.01.2010 |
Insurance policy of Assets of AGBPP,291 MW, Bokulini, Dibrugarh, Assam-786191
due for renewal on 18.03.2010 ( midnight ) |
|
|
| 6/2010 |
NEEPCO/ED/QP/C&P/Insurance Policy/KHEP stage-II/385/ 2009-2010 |
27.01.2010 |
Insurance policy of Assets of Kopili Stage-II(1x25MW), Umrangso, North Cachar Hills , Assam due for renewal on 18.03.2010 ( midnight |
|
|
| 5/2010 |
NIQ No. 10 NEEPCO/AGTP/EM/2009-10 |
16.01.2010 |
Supply of Electrical Items |
|
|
| 4/2010 |
NIB No. 7 |
08.01.2010 |
Supply of Computer Spares |
Corrigendum |
Download |
| 3/2010 |
NIB No. 6 |
08.01.2010 |
Supply of Computer Consumables |
Corrigendum |
Download |
| 2/2010 |
NIT No. NEEPCO/HoP/KPC/KaHEP |
08.01.2010 |
Execution of the following work at Kimi Power House Site under Kameng Hydro Electric Project |
|
|
| 1/2010 |
NIQ 01/2010/KHEP/DGM(C) |
05/01/2010 |
Servicing 2(two) Hydraulic Hoist systems of the Service sluice gates of the Khandong Dam, Kopili H.E. Plant |
Corrigendum |
Download |
| 119/2009 |
NIQ No. RHEP/US&W-17 |
24/12/2009 |
Supply of Electrical material |
|
|
| 118/2009 |
NIT No. 09-10 |
24/12/2009 |
Construction of Main Entrance Gate of Kalakshetra, Guwahati. |
|
Download |
| 117/2009 |
NIT No. 15/SRMC-I/AGTP/2009 |
23/12/2009 |
Construction of boundary wall and entrance gate |
|
|
| 116/2009 |
NEEPCO/ED/QP/C&P/Insurance Policy/RHEP/387/2009-10/2111-127 |
23/12/2009 |
Insurance Policy of RHEP |
|
|
| 115/2009 |
NIT No. 05/SRMC-II/AGTP/2009 |
22/12/2009 |
Providing Seal Coat (Type-C) and repairing of pot holes of the bituminous roads at Residential Colony complex. |
Corrigendum |
|
| 114/2009 |
NIQ No. 09 NEEPCO/AGTP/EM/2009-10 |
22/12/2009 |
Supply of Electrical Items for AGTP |
|
|
| 113/2009 |
NIT No. 14/SRMC-I/AGTP/2009 |
21/12/2009 |
Construction of retaining wall and earth filling |
|
|
| 112/2009 |
Expression of Interest No. AGBP/F&S/EOI-02/2009 |
15/12/2009 |
Health checkup of existing Fire Protection system installed at Assam Gas Based Power Plant |
Corrigendum |
|
| 111/2009 |
NIT No. 07/2009-2010 |
10/12/2009 |
Construction of an open shed at Power House Site, RHEP,Yatee,A,P. |
|
|
| 110/2009 |
NIT No. 06/2009-2010 |
1/12/2009 |
Construction of Security Booth near Godown No. 04 at Power House site, RHEP,Yayee, A.P. |
|
|
| 109/2009 |
DETAIL NIT KHEP/2009/117 |
3/12/2009 |
Supply of valves |
Corrigendum |
Download |
| 108/2009 |
LIMITED NIT KHEP/2009/116 |
26/11/2009 |
Supply of the material |
|
|
| 107/2009 |
NIT NO. KHEP/2009/115 |
11/11/2009 |
Supply and delivery of consumables required for Khandong Power Station |
|
|
| 106/2009 |
NIT No. KHEP/2009/114 |
11/11/2009 |
Supply and delivery of equipment |
|
|
| 105/2009 |
NIT No. RHEP/PH&SY(M)/11/09-10 |
6/11/2009 |
Supply of Thermostat, RTD & DTT for 3 X 135 MW Dikrong Power Stations of Ranganadi HE Plant |
|
|
| 104/2009 |
NIT No-13/SRMC-I/AGTP/2009 |
31/10/2009 |
Making arrangement for providing drinking water facilities to the devotees gathered in the premises of "Chaturdash(14) Devta temple" at Old Agartala, near Khayerpur, Tripura(W). |
|
|
| 103/2009 |
NIT No. 04/SRMC-II/AGTP/2009 |
30/10/2009 |
Transportation of Materials for repairing and overhauling of 2 (Two) Water Treatment Plants from Kolkata ( Howrah ) to AGTP, NEEPCO Ltd., Ramchandranagar, Agartala, Tripura (W) |
|
|
| 102/2009 |
NIT No. KHEP/2009/113 |
29/10/2009 |
Dismantling, repair of guide vanes, weld build up of underwater parts of turbine, fabrication and replacement of cooling water pipelines, Annual Planned Maintenance, re-assembly and re-commissioning of the 2x25 MW Hydro Turbine Generating Units at Khandong Power Station of Kopili Hydro Electric Plant |
Corrigendum Corrigendum 2 |
Download |
| 102/2009 |
NIT No. 03/SRMC-II/AGTP/2009 |
27/10/2009 |
Construction of brick flooring and construction of footpath |
|
|
| 101/2009 |
NIT No. SRMC-I/AGTP-09/ 2009 |
23/10/2009 |
Painting of Power House Building and Axuilliary Buildings at AGTP |
|
|
| 101/2009 |
NIQ No. 01/2009-2010 |
20/10/2009 |
Supply of G.I. Pipes for Ranganadi Hydro Electric Plant |
|
|
| 100/2009 |
NIT No. 04 /2009-2010 |
9/10/2009 |
Execution of works at Surge Shaft area of Ranganadi Hydro Electric Plant |
|
|
| 99/2009 |
Notice Inviting Quotations 08 NEEPCO/AGTP/EM/2009-10 |
9/10/2009 |
Supply of Aux. Hydraulic Pump/Motor Coupling Set |
Time Extension |
|
| 98/2009 |
NIT No. 18/2009/U&WC/T-46/AGBP |
5/10/2009 |
Supply and fitting and fixing of Medium Voltage Line Cover (MVLC) for existing overhead 11 KV Intake feeder |
|
|
| 97/2009 |
NIQ No. AGTP/SRMC-I/02/2009 |
29/09/2009 |
Supply of GI pipes |
|
|
| 96/2009 |
No. 09/2009/KHEP/DGM(C) |
22/09/2009 |
Construction of new store building at Kopili Power Station premises |
|
|
| 95/2009 |
NIT No. KHEP/2009/112 |
22/09/2009 |
Supply and delivery of power house consumables |
|
|
| 94/2009 |
NIT No. KHEP/2009/111 |
22/09/2009 |
Supply and delivery of materials |
|
|
| 93/2009 |
NIT No. KHEP/2009/110 |
22/09/2009 |
Supply and delivery of power house consumables |
|
|
| 92/2009 |
NIT No. 09/2009/KHEP/DGM(C) |
22/09/2009 |
Construction of new store building at Kopili Power Station |
|
|
| 91/2009 |
NIT 01/2009/EDP/O&AWW/AGBP |
22/9/2009 |
Supply of UPS and TFT monitors |
|
|
| 90/2009 |
NIT No. E-37/2009/PHEP/DM(Admn)/01 |
16/09/2009 |
Hiring of Bus |
|
|
| 89/2009 |
NIB No: 01/2009 |
10/09/2009 |
|
Corrigendum Corrigendum 2 Corrigendum 3 |
Download |
| 88/2009 |
NIT AGBP/CWC/11 |
9/09/2009 |
Repairing and Premix carpeting work of ring road and other approaches to different structures from ring road at plant area of AGBP. |
|
|
| 87/2009 |
NIT No. AGTP/SRMC-II/ 02/ 2009 |
09/09/2009 |
Repairing work of ‘A' Type Buildings (A -1 to A – 40) at Residential Colony Complex of AGTP, NEEPCO Ltd., Ramchandranagar, Tripura(W). |
|
|
| 86/2009 |
DETAILED NIT NO. KHEP/2009/109 |
09/09/2009 |
Manufacture, shop testing, supply, delivery, supervision of retrofitting, testing and commissioning of 2 Nos. 145KV class SF6 Circuit Breakers |
Corrigendum Corrigendum-2 Corrigendum-3 |
Download |
| 85/2009 |
NIQ No.AGTP/SRMC-I/01/2009 |
09/09/2009 |
Supply of G.I. pipes For Agartala Gas Turbine Power Plant |
|
|
| 84/2009 |
NIT No. AGTP/SRMC-II/ 01 /2009 |
7/09/2009 |
Dismantling of damaged windows, ventilators etc. & repairing, re-fixing of the same in position alongwith glass panes, putty etc. of ‘A'-Type & ‘B' –Type Buildings at Residential Colony Complex of AGTP |
|
|
| 83/2009 |
TENDER NO: NEEPCO/ES/R/42/2009-10/ 02 |
1/09/2009 |
Operation maintenance of electrical installations consisting of 11KV HT and LT panel, transformer and other ancillary equipment fittings and wiring system of NEEPCO office Complex at Shillong |
|
|
| 82/2009 |
NIT No : RHEP/PH&SY(M) /08/09-10 |
26/08/2009 |
Supply of Aluminum ladder & Material Handling equipment |
Corrigendum |
|
| 81/2009 |
Short NIT No. 01/2009/ST&AUX/AGBP |
24/08/2009 |
Supply of MS Pipes & Fittings to AGBP |
|
|
| 80/2009 |
NIT No. 07 NEEPCO/AGTP/EM/2009-10 |
22/08/2009 |
Supply of the electrical items for AGTP |
Time Extension Time Extension 2 TimeExtension 3 |
|
| 79/2009 |
NIT No. 01/2009 |
18/08/2009 |
Running and Maintenance including House Keeping of NEEPCO Transit Camp |
Corrigendum |
|
| 78/2009 |
NIT No. RHEP/PH&SY(M)/07/09-10 |
18/08/2009 |
Supply of 2 Ton Geared Trolley & Chain Pulley Block required for 3 X 135 MW Dikrong Power Stations |
|
|
| 77/2009 |
NIQ. PERS/27/1/364 |
17/08/2009 |
Printing and Supply of Calendar and diary. |
|
|
| 76/2009 |
No: NEEPCO/ED/QP/C&P/Insurance Policy/KPH/397/ 2009-10/1405-21 |
14/08/2009 |
Limited tender for Insurance Policy of Khandong Power house, Umrangso |
|
|
| 75/2009 |
NIT No. 05/2009/KHEP/DGM(C) |
12/08/2009 |
Construction of new Store Building at Kopili Power station premises, KHEP, Umrongso , N.C. Hills, Assam |
|
|
| 74/2009 |
Detail NIT KHEP/2009/108 |
10/08/2009 |
Supply, delivery and commissioning of 1 No. 12 KV Tan Delta Kit and Capacitance Test Kit required for the 1x25 MW Kopili Stage-II Power Station |
|
Download |
| 73/2009 |
Short NIT No. 2 NEEPCO/AGTP/P&A/2009 |
5/08/2009 |
Operation and Maintenance including House Keeping of NEEPCO Guest House |
|
|
| 72/2009 |
No. NEEPCO/ED/QP/C&P/Insurance Policy/PLI/395/2009-10/1206-22 |
29/07/2009 |
Renewal of Public Liability Insurance Policy of NEEPCO |
|
|
| 71/2009 |
NIT No. 03/2009-2010 |
24/07/2009 |
Construction of retaining wall along with drain, footpath at Quarter No, A-24 at Power House site, RHEP, Yayee, A.P. |
|
|
| 70/2009 |
NIT No. 6 NEEPCO/AGTP/EM/2009-10 |
23/07/2009 |
Supply of material for AGTP, NEEPCO |
Time Extension |
|
| 69/2009 |
NIT No. 5 NEEPCO/AGTP/EM/2009-10 |
23/07/2009 |
Supply of material for AGTP, NEEPCO |
Time Extension |
|
| 68/2009 |
NIT No. 4 NEEPCO/AGTP/EM/2009-10 |
22/07/2009 |
Supply of 672 pair self cleaning air filter elements for inlet air filter house of Frame – V Gas Turbine units at AGTP NEEPCO |
|
|
| 67/2009 |
Detail NIT KHEP/2009/107 |
16/07/2009 |
Supply and delivery of 70:30 Cu:Ni Cooler tubes to Kopili Hydro Electric Plant |
|
Download |
| 66/2009 |
Detail NIT KHEP/2009/106 |
4/07/2009 |
Manufacture, shop-testing, supply and delivery of 3 Nos. of 36KV class SF6 Circuit Breakers |
Corrigendum Corrigendum 2 Corrigendum 3 |
Download |
| 65/2009 |
NIT No. RHEP/PH&SY(M)/06/09-10 |
4/07/2009 |
Supply of the following Jelly filled telephone cables & D-Drop telephone wire |
|
|
| 64/2009 |
Short NIT No. 01 NEEPCO/AGTP/P&A |
3/07/2009 |
Operation and Maintenance including House Keeping of NEEPCO Guest House |
Time Extension |
|
| 63/2009 |
NIT No. 01/2009 |
1/07/2009 |
Procurement of IP Surveillance camera system for monitoring status of various meters of Dikrong Power House, RHEP |
|
|
| 62/2009 |
Detailed NIT No:03/2009/AGBP |
29/06/2009 |
Consultancy in the field of gas based combined cycle power plant for preperation of Detailed Feasibility Report for renovation & modernisation of the 291 MW AGBP Plant at Bokuloni Village Dibrugarh District , Assam |
Corrigendum1 Corrigendum 2 |
|
| 61/2009 |
NIQ No : 03 |
27/06/2009 |
Supply of Cement-PPC conforming IS 1489-1976 |
|
|
| 60/2009 |
NIT No. RHEP/PH&SY(M)/04/09-10 |
26/06/2009 |
Construction of modular work station for Ranganadi Hydro Electric Plant (405 MW) |
Time Extension |
|
| 59/2009 |
NIT NO. 02/ 2009-2010 |
24/06/2009 |
Execution of works at Surge Shaft area of Ranganadi Hydro Electric Plant (405MW), NEEPCO Ltd, Yayee, District: Papumpare, Arunachal Pradesh. |
|
|
| 58/2009 |
NIT No. PERS/Admn-2/02 |
23/06/2009 |
Supply of Stationery Items |
|
|
| 57/2009 |
NIT No. RHEP/PH&SY(M)/03/09-10 |
23/06/2009 |
GPS Clock System |
Time Extension-1 |
|
| 56/2009 |
NIT No. 01/2009-2010 |
18/06/2009 |
Construction of Storage Tank, water supply point with P.C.C. plant form at Pussa |
|
|
| 55/2009 |
NIB No. NEEPCO/ES/R/42/2009-10/01 |
16/06/2009 |
Renovation of toilet blocks |
|
|
| 54/2009 |
NIT No 01/2009-2010 |
15/06/2009 |
Renovation of the Security Boundary Wall at Surge Shaft, RHEP, Yayee, A.P. |
|
|
| 53/2009 |
NIT No. 02/2009/AGBP |
12/06/2009 |
Supply, delivery of chemicals |
Corrigendum |
|
| 52/2009 |
NIT No. 3 NEEPCO/AGTP/EM/2009-10 |
11/06/2009 |
Filter Element of Type MFK-674-39.3 |
Time Extension Time Extension 2 TimeExtension 3 |
|
| 51/2009 |
NIT NO. 2 NEEPCO/AGTP/EM/2009-10 |
8/06/2009 |
Supply of items for AGTP |
Time Extension Time Extension 2 TimeExtension 3 TimeExtension 4 |
|
| 50/2009 |
NIQ RHEP/HSM/NIQ-01 |
6/06/2009 |
Design, fabrication & supply of Manually Operated Boat made of Fibre Glass |
|
|
| 49/2009 |
DETAILED NIT No. KHEP/2009/105 |
3/06/2009 |
Supply and Door Delivery of EHV Grade Transformer Oil |
|
|
| 48/2009 |
No. NEEPCO/ED/QP/C&P/Insurance Policy/DHEP/391/2009-10/ |
01/06/2009 |
Limited tender for Insurance policy of Doyang Hydro Electric Project |
|
|
| 47/2009 |
No. NEEPCO/ED/QP/C&P/Insurance Policy/AGTP/392/2009-10 |
01/06/2009 |
Limited tender for insurance policy of Agartala Gas Turbine Power Project |
|
|
| 46/2009 |
NIB No 45 |
21/05/2009 |
Package III(Electro-Mechanical Equipment, comprising of TG Units with all Auxlliairies) for Pare Hydro Electric Project (2x55MW) District-Papumpare, Arunachal Pradesh, India |
Reply to bidder's queries Corrigendum 1 Corrigendum 2 Corrigendum 3 |
Download |
| 45/2009 |
NIT No. 10/SRMC-1/AGTP/2009 |
21/05/2009 |
Repairing of Chowkhats, doors and windows in the Administrative Bldg. and the security post near plant gate at AGTP |
|
|
| 44/2009 |
NIB No 44 |
20/05/2009 |
Design, Fabrication, Supply & Installation of all Hydro Mechanical Works of Pare Hydro Electric Project, Arunachal Pradesh, India |
Corrigendum01 Corrigendum 2 Corrigendum 3 Corrigendum 4 Corrigendum 5
Pre Bid meeting Reply to bidder's queries |
Download |
| 43/2009 |
NIT No. 01/09-10/PHEP/Sr.M(C) |
12/05/2009 |
Construction of Ropeway Suspension Bridge at Pare H.E. Project, Arunachal Pradesh |
Corrigendum |
|
| 42/2009 |
NIB No. 43 |
8/05/2009 |
Design and Review Consultancy Works for various work of
Pare Hydro Electric Project located in the Papumpare District of the State of Arunachal Pradesh
in India. |
Corrigendum 1 Corrigendum 2 Corrigendum 3 Corrigendum 4
Corrigendum 5 |
Download |
| 41/2009 |
NIT No. 01/2009/SFC/AGBP |
29/04/2009 |
Design, Manufacture, Shop Testing, Supply, Delivery and
Installation of Fabric belt & Insulation materials of Non-Metallic Expansion
Joints suitable for Inlet and Exhaust system of MHI make Gas Turbine |
Corrigendum Corrigendum 2 |
|
| 40/2009 |
NIT No. RHEP/PH&SY(M)/02/09-10 |
28/04/2009 |
SSupply of 40 HP Submersible Pump |
Corrigendum Time Extension |
|
| 39/2009 |
NIT No. 01 NEEPCO/AGTP/EM |
28/04/2009 |
Disposal of Used Air Filter Element |
|
|
| 38/2009 |
NIQ No. RHEP/US&W-16 |
27/04/2009 |
Supply of material |
|
|
| 37/2009 |
No. : NEEPCO/IT/Insurance/11/2009-10/01-17 |
01/04/2009 |
Limited tender for Insurance policy of Electronic Assets of IT Department,Shillong |
|
|
| 36/2009 |
NIB No. 42 |
25/03/2009 |
Construction of Concrete Gravity Dam, Spillway and Appurtenant works, Coffer Dam and Diversion Tunnel, HRT Intake, Head Race Tunnel including Adits, Surge Shaft, Civil Works of Pressure Shaft, Powerhouse and Tailrace |
Corrigendum 1 Corrigendum 2 Clarification 1 Clarification 2 |
Download |
| 35/2009 |
NIQ NO. RHEP/US&W-15 |
16/03/2009 |
Supply of electrical materials to Ranganadi Hydro Electric Power Project, Arunachal Pradesh. |
Time Extension |
|
| 34/2009 |
FH/08-09/03 |
02/03/2009 |
Design, Drawing, Supply, Transportation, Errection, and Commissioning of 5000Ltrs/hr. capacity Iron removal plant for NEEPCO Bhawan complex, R.G. Baruah Road, Guwahati-5 |
|
Download |
| 33/2009 |
NIT Guest House |
10/03/2009 |
Operation and Maintenance including House Keeping of NEEPCO Guest House |
Time Extension |
|
| 32/2009 |
NIT 01/09 |
05/03/2009 |
Hiring of vehicle |
|
|
| 31/2009 |
NIT KHEP/2009/104 |
5/03/2009 |
Supply and delivery of the following materials required for Kopili Hydro Electric Plant , NEEPCO Ltd. , Umrongso |
|
|
| 30/2009 |
NIT KHEP/2009/103 |
5/03/2009 |
Supply and delivery of materials required for Kopili Hydro Electric Plant , NEEPCO Ltd. , Umrongso |
|
|
| 29/2009 |
No. NEEPCO/ED/QP/C&P/Insurance Policy/KHEP stage-I/388/2008-09/2105-21 |
4/03/2009 |
Insurance policy of Assets of Kopili including 1st Stage Extension, Umrongso |
|
|
| 28/2009 |
No : NEEPCO/ED/QP/C&P/Insurance Policy/HQ/389/2008-09/2089-2102 |
4/03/2009 |
Insurance policy of Head Quarter Complex |
|
|
| 27/2009 |
NIT No. 08/SRMC-1/AGTP/2009 |
2/03/2009 |
Water proofing treatment of roof, Treatment of expansion/ Contraction joints and Sealing joints of various metallic outlets on the roof of power house building at AGTP,NEEPCO, Ramchandranagar, Agartala, Tripura (West). |
Extension Notice |
|
| 26/2009 |
NIT No. 07/SRMC-1/AGTP/2009 |
2/03/2009 |
Laying of cables from Plant Area to Colony Area for EPBAX System at AGTP, NEEPCO, Ramchandranagar. |
Corrigendum |
|
| 25/2009 |
NIQ No. RHEP/US&W-14 |
2/03/2009 |
Supply of electrical materials |
|
|
| 24/2009 |
NIB No. 05 |
1/03/2009 |
Supply, delivery, installation, commissioning of LAN equipment and seamless integration with the existing NEEPCO's VSAT Network and Internet at Kopili Hydro Electric Project, Umrangso, N.C. Hills, Asom |
|
Download |
| 23/2009 |
NIT No. 07/2008-09 |
27/02/2009 |
Construction of RCC retaining wall behind C-type permanent building(C-l) at Power House Colony of Dikrong Power House at Hoz, RHEP, Arunachal Pradesh. |
|
|
| 22/2009 |
NIB No. RHEP/PH&SY(M)/08-09/13 |
25/02/2009 |
Supply of M.S. Seamless pipe conforming to API 5L Gr-B for conveying air, oil, & water under pressure. |
|
Download |
| 21/2009 |
NIT No. 01/2009/AGBP |
24/02/2009 |
Chemical treatment of cooling water |
Corrigendum |
|
| 20/2009 |
NIT No. 25/2008/KHEP/DGM(C) |
20/02/2009 |
Hydro-Mechanical Works (New Works and Repair and Re-commissioning of existing works) for Khandong Surge Shaft, Kopili Hydro Electric Plant, Umrongso , Assam |
Corrigendum |
Download |
| 20/2009 |
NIT 04/2008-09 |
18/02/2009 |
Construction of canteen building adjacent to Dikrong Power House, Hoz, Arunachal Pradesh. |
|
|
| 19/2009 |
NIT No. 06/SRMC-I/AGTP/2009 |
17/02/2009 |
Construction of Bio-degradable waste pit and non-biodegradable waste pit with an approach path in the Residential Colony Complex of AGTP, Ramchandranagar, Tripura(West) |
|
|
| 18/2009 |
NIT No. 05/SRMC-I/AGTP/2009 |
17/02/2009 |
Construction of Bio-degradable waste pit and non-biodegradable waste pit in the office complex as well as in the plant complex of AGTP, Ramchandranagar, Tripura(West) |
|
|
| 17/2009 |
NIT No. 10 NEEPCO/AGTP/EM/2008-09 |
11/02/2009 |
Disposal of Used Air Filter Element |
|
|
| 16/2009 |
NIT No. 09 NEEPCO/AGTP/EM/2008-09 |
11/02/2009 |
Supply of the material for AGTP, NEEPCO |
Time Extension |
|
| 15/2009 |
NIT No. 01/2009/PHEP/(P&A) |
6/02/09 |
Supply of TATA Bolero 2 WD new vehicles on monthly hire
charge basis |
Corrigendum |
|
| 14/2009 |
NIT No. 08 NEEPCO/AGTP/EM |
6/02/09 |
Transportation of materials |
Cancellation Notice |
|
| 13/2009 |
NIT No 07 NEEPCO/AGTP/EM |
6/02/09 |
Transportation of one 2 MVA, 33/11 KV, 3 phase Transformer filled with oil |
Time Extension |
|
| 12/2009 |
NIB No. 41 |
29/01/09 |
Design, Engineering, Manufacture, Shop-testing at manufacturer’s works before despatch, Packing, Loading, Transit Insurance and Transportation to site, and Supervision of Erection, Testing and Commissioning of 1(one) No 11/220/√3 KV, single phase, OFWF 20 MVA Generator Transformer |
corrigendum Corrigendum 2 |
Download |
| 11/2009 |
NIT No 04/SRMC-I/AGTP/2009 |
06/02/2009 |
Dismantling of existing market sheds and reconstruction |
|
Corrigendum |
| 11/2009 |
NIT No. ES/R/42/2008-09/04 |
04/02/2009 |
Supply work of water supply and sanitary materials. |
|
|
| 10/2009 |
NIT No 06/2008-09 |
03/02/2009 |
Construction of footpath step from Plan-IV to circular road at P.H, Hoz Arunachal Pradesh. |
|
|
| 9/2009 |
NIB No. 01/2009/BDC |
30/01/2009 |
Design, engineering, manufacture, assembly, testing before despatch, packing, forwarding, handling, insurance, supply, transportation, delivery F.O.R. site, loading, unloading at designated place of Kameng Hydro Electric Project, supervision of erection, testing and commissioning transformers. |
corrigendum Corrigendum 2 |
Download |
| 8/2009 |
No: NEEPCO/ED/QP/C&P/Insurance Policy/AGBPP/386/2008-09/1944-1960 |
03/02/2009 |
Limited tender for Insurance policy of Assets of AGBPP |
|
|
| 7/2009 |
No: NEEPCO/ED/QP/C&P/Insurance Policy/KHEP Stage-II/385/2008-09/1925-41 |
03/02/2009 |
Limited tender for Insurance policy of Assets of Kopili Stage-II |
|
|
| 6/2009 |
NIT No-03/SRMC-I/AGTP/2009 |
02/02/2009 |
Construction of hexagonal shed and a R.C.C. Chula for the Crematorium |
Corrigendum |
|
| 5/2009 |
NIT No-02/SRMC-I/AGTP/2009 |
27/01/2009 |
Repairing, painting & roof water proofing treatment of R.C.C. library-cum Community Centre |
|
|
| 4/2009 |
NIQ 01/2008-09/AGBP/SR M(E) |
23/01/2009 |
Selling of vehicles |
|
|
| 3/2009 |
NIT No. 01/SRMC-I/AGTP/2009 |
20/01/2009 |
Clearance of Jungle |
|
|
| 2/2009 |
NIT No. NIT/2009/102 |
17.01.2009 |
Supply and delivery of the materials required for laying of cables for UPS connections at Kopili Hydro Electric Plant , NEEPCO Ltd. , Umrongso |
|
|
| 1/2009 |
No. NEEPCO/ED/QP/C&P/Insurance Policy/RHEP/387/2008-09/1797-1813 |
06/01/2009 |
Limited tender for Insurance Policy of RHEP, 405 MW, Yazali, Arunachal Pradesh |
|
|
| 109/2008 |
NIT No. 05/2008-09 |
26/12/2008 |
Construction of new approach road from Power House to Godown No.4 at Hoz, Arunachal Pradesh. |
|
|
| 108/2008 |
NIT No. KHEP/2008/101 |
22/12/2008 |
Annual Planned Maintenance of 2x25MW TG at Khandong Power Station and repairing of MIV,installation of gate valves and replacement of Cooling water header pipes of 1 x 25 MW Kopili Stage-II Power Station |
Corrigendum |
|
| 107/2008 |
NIQ NO. RHEP/US&W-13 |
12/12/2008 |
Supply of materials as mentioned in the tender document for Ranganadi Hydro Electric Project, Arunachal Pradesh. |
Time Extension |
|
| 106/2008 |
NIQ NO. RHEP/US&W-12 |
11/12/2008 |
Supply of Electrical Materials as detailed in the Tender Document for Ranganadi Hydro Electric Project , Arunachal Pradesh |
Corrigendum1 |
|
| 105/2008 |
NIB No. 4 |
8/12/2008 |
Supply of Software |
Time Extension |
Download |
| 104/2008 |
TENDER NO-03 /2008-09 |
04/12/08 |
Repairing of flooring and plastering in patches of Power House building including painting of walls, ceilings etc. at floor EL 247.50m , 243.00m and MIV floor of Ranganadi Hydro Electric Plant, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 103/2008 |
NIT No. 02 /2008-09 |
27/11/2008 |
Water proofing treatment with Polygrout / EXCEM-C at TG wall, Pump floor, Cable trench floor and MIV floor of RHEP, NEEPCO Ltd, Arunachal Pradesh. |
Extension Notice Extension Notice2 |
|
| 102/2008 |
NIT No. AGBP/CWC/25 |
24/11/2008 |
Construction of First Floor on the existing fire station building and repairing and renovation of Play House School at AGBP |
|
|
| 101/2008 |
NIT No. ES/R/42/2008-09/03 |
24/11/2008 |
Supplying, fitting & fixing interlocking Pavers at parking area at NEEPCO Corporate Office, Shillong |
|
|
| 100/2008 |
NIB No. 02/08 |
12/11/2008 |
DTH Satellite Television for residential quarters of Ranganadi Hydro Electric Plant |
|
Download (Link has been removed on request) |
| 99/2008 |
NIQ No. 19/2008/KHEP |
12/11/2008 |
Supply of materials to Kopili H.E. Plant, Umrongso, N.C. Hills, Assam. |
|
|
| 98/2008 |
NIT No. 01/08/PHEP/Sr.M(C) |
10/11/2008 |
Construction of Executive and Staff Hostels at Dam Site of Pare H.E. Project |
|
|
| 97/2008 |
NIT No. 01/08/PHEP/DGM(C) |
7/11/2008 |
Construction of Executive and Staff Hostels at Power House Site of Pare H.E. Project |
|
|
| 96/2008 |
NIT No. KHEP/2008/100 |
6/11/2008 |
Disposal of Old Battery Casings |
|
|
| 95/2008 |
NIT No. KHEP/2008/99 |
4/11/2008 |
Manufacture, shop-testing, supply and delivery of 70:30 Cu:Ni Cooler tubes for LGB, UGB, TGB Oil coolers and Generator Air coolers |
Corrigendum
Corrigendum 2
Corrigendum 3 Corrigendum 4 |
Download |
| 94/2008 |
NIQ NO. RHEP/US&W/-11 |
1/11/2008 |
Supply of electrical materials |
|
|
| 93/2008 |
NIB 40 |
29/10/2008 |
Erection, Testing and Commissioning of 1(one) No 132/33 KV, 3 phase, ONAN 2.5 MVA Step-down Transformer at Doyang HEP |
Corrigendum Corrigendum 2 |
Download |
| 92/2008 |
NIT No. KHEP/2008/98 |
22/10/2008 |
Repairing & Maintenance of Internal Electrification of residential / non- residential buildings as well as Outdoor/ Indoor type HT / LT electrical distribution system |
|
|
| 91/2008 |
NIT No. KHEP/2008/97 |
21/10/2008 |
Supply and delivery of material required for 2x25 MW Khandong Power Station under Kopili H.E. Plant |
|
|
| 90/2008 |
NIT No. 05/2008/AGBP |
18/10/2008 |
Supply and Delivery of Personal Protective Equipments for Assam Gas Based Power Plant |
Corrigendum
|
|
| 89/2008 |
NIT No. KHEP/2008/96 |
15/10/2008 |
Supply and delivery of the following materials required for Khandong Power Station of Kopili H.E. Plant |
Corrigendum |
|
| 89/2008 |
NIT No. 16/2008/KHEP/DGM(C) |
3/10/2008 |
Construction of 1 st Floor of Field Hostel at Kopili Power Station, KHEP, Umrongso, N.C. Hills, Assam. |
Corrigendum |
|
| 88/2008 |
NIQ 12 |
3/10/2008 |
Procurement of Duplex Strainers for Cooling Water system of Generator Transformer |
Time Extension Time Extension 2
Time Extension 3 |
|
| 87/2008 |
NIQ 11 |
3/10/2008 |
Procurement of mechanical materials |
|
|
| 86/2008 |
NIT No. KHEP/2008/95 |
27/09/2008 |
Day to Day Maintenance and Annual Planned Maintenance of 4 x 50 MW Kopili Power Station |
Corrigendum |
|
| 85/2008 |
NIT No. KHEP/2008/94 |
24/09/2008 |
Supply and delivery of the materials required for Maintenance of 4 X 50 MW Kopili Power Stations at Kopili Hydro Electric Plant |
Corrigendum Corrigendum 2 |
|
| 84/2008 |
NIB No. 01/08 |
22/09/2008 |
Supply of Professional HD LCD monitor / display for Ranganadi Hydro Electric Plant (405 MW).
|
|
Download |
| 83/2008 |
NIT No. 04/2008/AGBP |
22/09/2008 |
Design ,Engineering,Supply,Erection ,Testing & Commissioning of Automatic Carbon Dioxide Fire Extinguisher in AGBPP, Bokuloni Dist Dibrugarh Assam |
Corrigendum |
|
| 82/2008 |
NIB No. 2 |
17/09/2008 |
Design engineering, Supply, installation, testing,Commissioning of Wireless Link between Doyang Administrative Building and Doyang Power Station Control Room through Radio communication |
Corrigendum |
Download |
| 81/2008 |
NIT No. KHEP/2008/93 |
11/09/2008 |
Supply and delivery of Power House consumables |
|
|
| 80/2008 |
NIT No. KHEP/2008/92 |
10/09/2008 |
Supply and Delivery of MS ERW and MS SEAMLESS PIPES for 4 x 50 MW Kopili Power Station |
Corrigendum |
|
| 79/2008 |
NIT No. 03/2008 |
09/09/2008 |
Interior Painting of Walls & Window Frames, Polishing of Doors etc of NEEPCO Guest House, Kolkata |
|
|
| 78/2008 |
NIT No. NEEPCO/AGBP/PEM/8-09 |
05/09/2008 |
Supply & Assembly at Site of Alumunium Self Supporting Extension Ladder for AGBPP, Bokuloni, Dist Dibrugarrh, Assam as detailed in the Tender Document . |
Corrigendum |
|
| 77/2008 |
NIT No. ES/R/42/2008-09/02 |
02/09/2008 |
AMC for supply and maintenance of Potted plants |
|
|
| 76/2008 |
NIT No. 14/2008/KHEP/DGM(C) |
01/09/2008 |
Painting of Kopili P.H. building and associated structure |
Corrigendum Corrigendum 2 |
|